The foundation has been poured and the water and sewer services have been connected to the city's pipes under Harrison Avenue. Last week Harrison Avenue was split in half as the street was dug up to access the pipes under the road. That's the street with a pile of dirt on it in the photo above. The neighbor's yard can be seen at the very bottom of the photograph. This week the floor of the basement, or "slab" is being poured over the pipes and crushed gravel which will direct the ground water away from the basement.
Thursday, July 1, 2010
Foundation Poured, Water Service Connected
The foundation has been poured and the water and sewer services have been connected to the city's pipes under Harrison Avenue. Last week Harrison Avenue was split in half as the street was dug up to access the pipes under the road. That's the street with a pile of dirt on it in the photo above. The neighbor's yard can be seen at the very bottom of the photograph. This week the floor of the basement, or "slab" is being poured over the pipes and crushed gravel which will direct the ground water away from the basement.
Labels:
foundation
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment