
We are expecting a flurry of activity this coming week as the contractors try to get the space ready for religious school on Sunday. Although there is a lot to do we have been assured that the space will be useable on Sunday. There will be a few things that won't get done until later, but the built-ins will be arriving on Monday and additional painting will follow. We will move in on Sunday with the religious school students helping.
Some of the lights were installed late last week. These photos show the ner tamid and lights over the reading table (above) and the light and windows next to the yahrzeit boards (below). The ner tamid is a beautiful red that was not captured well by the camera. The memorial boards will be installed to the right of the light and will be one of the last things completed.
No comments:
Post a Comment